Table 1. Overlap of requirements between RSPO Principles & Criteria [52], Renewable Energy Sources-Directive (Article 17) [49] and RSB Principles & Criteria [53]. For details on the criteria see File S2.
RSPO | RES-D | RSB |
---|---|---|
HCV 1.1 | 3b i | P1, P7a, P7c |
HCV 1.2 | 3b ii | P7a |
HCV 1.3 | 3b ii | P7a |
HCV 1.4 | P7a | |
HCV 2.1 | P7a, P7c | |
HCV 2.2 | P7a | |
HCV 2.3 | P7a | |
HCV 3 | 3b ii | P7a |
HCV 4.1 | P7a, P7b, P9 | |
HCV 4.2 | P7a, P7b, P8 | |
HCV 4.3 | P7a, P7b | |
HCV 5 | P5, P6, P12a | |
HCV 6 | P12a | |
C7.5:FPIC | P2b, P12b |