Skip to main content
. 2013 Sep 9;8(9):e74125. doi: 10.1371/journal.pone.0074125

Table 4. Mixed-effects analysis of resting state and task data before and following task switches (R1, T1, T5 and R2): Effects of task switch (RS vs. task period), time point (data at the first switch vs. the second) and task switch-by-time point interaction on (i) mean connectivity strength, (ii) functional network and (iii) physical distance metrics.

Response Factor Statistics
Connectivity Strength(a) Task switch (RS to task, or task to RS period) F(1,57) = 0.05, p = 0.83
Time point (begin or following the task) F(1,57) = 7.52, p<0.01
Interaction switch*time point F(1,57) = 0.26, p = 0.27
Global Efficiency(a) Task switch F(1,57) = 60.0, p<.0001
Time point F(1,57) = 25.8, p<.0001
Interaction switch*time point F(1,57) = 3.5, p = 0.07
Clustering Task switch F(1,57) = 23.15, p<.0001
Time point F(1,57) = 16.07, p<0.001
Interaction switch*time point F(1,57) = 3.53, p = 0.07
Physical Distances(a) Task switch F(1,57) = 0.93, p = 0.34
Time point F(1,57) = 21.18, p<.0001
Interaction switch*time point F(1,57) = 0.71, p = 0.40
(a)

corrected for unequal variances.