Table 4. Median mesothelioma latency and adjusted time ratios for mesothelioma latency among British asbestos workers (1978–2005), by main industry sector.
Main industry sector during follow-up | No. of deaths | Person- years at risk | Median latency (years) | (95% CI) | Adj. time ratio | (95% CI) | LR test |
---|---|---|---|---|---|---|---|
Manufacturing |
|
|
|
|
|
|
P=0.114 |
Textiles | 16 | 246 | 34.0 | (15.5–35.7) | 1.07 | (0.91–1.25) | |
Asbestos cement mixture, board and pipe | 27 | 405 | 15.9 | (6.6–34.6) | 1.01 | (0.95–1.08) | |
Asbestos/rubber/resin/bitumen mixtures | 20 | 260 | 17.7 | (4.8–32.2) | 0.95 | (0.88–1.02) | |
Asbestos board and paper | <5 | NR | NR | NR | NR | NR | |
Garments | <5 | NR | NR | NR | NR | NR | |
Insulation and plastering mixes | <5 | NR | NR | NR | NR | NR | |
Maintenance | 31 | 473 | 17.5 | (10.5–36.4) | 0.96 | (0.91–1.02) | |
Missing |
103 |
1672 |
26.1 |
(1.2–34.4) |
0.98 |
(0.94–1.02) |
|
Removal |
200 |
2899 |
19.6 |
(13.9–26.8) |
0.97 |
(0.94–1.06) |
|
Other |
|
|
|
|
|
|
|
Ship building, repair and breaking | 23 | 329 | 8.2 | (8.2–28.6) | 1.05 | (0.98–1.13) | |
Building and construction | 6 | 71 | 25.5 | (19.7–NE) | 0.81 | (0.72–0.90) | |
Miscellaneous | 9 | 169 | 29.9 | (15.4–35.8) | 1.08 | (0.97–1.20) | |
Missing |
44 |
736 |
27.2 |
(6.2–35.4) |
0.98 |
(0.93–1.03) |
|
Insulation | 129 | 1915 | 20.3 | (2.2–31.3) | 1.00 | (ref) |
Abbreviations: Adj. time ratio=time ratios adjusted for sex, main smoking status, year since first exposure, age at first exposure, duration of exposure, mesothelioma type, and presence of asbestosis estimated using a generalised gamma accelerated failure-time model; CI=confidence interval; LR test=likelihood-ratio test; NE=not estimable; NR=not reported since number of deaths was fewer than five; ref=reference category.