Skip to main content
. 2013 Oct 1;20(Pt 6):820–825. doi: 10.1107/S0909049513021833

Figure 3.

Figure 3

Beamline set-up during an experiment. The Isco 500D pumps and the master control flush the reagents to the micromixer. After the beam is focused by the KB mirror and cleaned by guard slits and aperture and hits the microchannel. The scattering signal is collected by a Pilatus detector, placed on the back of the flight tube.