Skip to main content
. 2013 Sep 25;13:888. doi: 10.1186/1471-2458-13-888

Table 1.

Expected mean and standard deviations for the primary outcome measures

  Intervention condition
Waitlist condition
Pre-intervention
Post-intervention
Pre-intervention
Post-intervention
M SD M SD M SD M SD
Expected PS Total score
3.0
0.6
2.7
0.6
3.0
0.6
3.0
0.6
Expected DASS-21 Total score 18 10 13 10 18 10 18 10