Skip to main content
. 2013 Dec 5;8(12):e81831. doi: 10.1371/journal.pone.0081831

Table 2. Details of conservation portfolio design process using Marxan analysis for each of the 5 pilot landscapes.

PILOT PROJECT PLANNING UNIT (Hexagon ha) TOTAL NUMBER OF HEXAGONS BOUNDARY LENGHT MODIFIER NUMBER OF RUNS
Coal Mining in Cesar 25 490,327 0.2 500
Gold Mining in Sur de Bolivar 300 5,846 1.750 100
Port expansion in Bahia Tribuga Choco 20 16,527 1.0 100
Macarena Road in Meta 100 8,510 10 500
Oil and Gas in Casanare 100 19,424 10 500