Table 3.
Method | Estimate | Std. err. |
---|---|---|
Naive g-est. | −0.3991 | 0.2469 |
Modified g-est. | −0.3481 | 0.2832 |
Controlling-the-future est. | −0.0840 | 0.1894 |
Method | Estimate | Std. err. |
---|---|---|
Naive g-est. | −0.3991 | 0.2469 |
Modified g-est. | −0.3481 | 0.2832 |
Controlling-the-future est. | −0.0840 | 0.1894 |