Skip to main content
. 2013 Dec 12;9(12):e1003345. doi: 10.1371/journal.pcbi.1003345

Figure 6. Different graph simplification operations.

Figure 6

(A) Consecutive nodes are merged. (B) Dead end (dotted circle) is removed. (C) Bubble (dotted circle) is simplified where low-coverage path of the two paths that caused it was removed. (D) X-cut is simplified by splitting the connections into two parallel paths.