Skip to main content
. 2013 Feb 4;18(4):201–208. doi: 10.1016/j.rpor.2012.12.005

Fig. 4.

Fig. 4

Mean differences between real (from HT system) and estimated (from correlation model) beam-on time in seconds and percentage for the second verification group of treatment plans. For correlation model presented results are before and after applying a correction factor.