Skip to main content
. Author manuscript; available in PMC: 2014 Apr 28.
Published in final edited form as: J Am Stat Assoc. 2013 Apr 28;108(503):10.1080/01621459.2013.794730. doi: 10.1080/01621459.2013.794730

Table 3.

Estimated parameters for the PDE model (2) from the LIDAR data set using the Bayesian method (BM), the parameter cascading method (PC), and the two-stage method (TS).

θD θS θA
Estimates BM −0.4470 0.2563 −0.0414
PC −0.3771 0.2492 −0.0407
TS −0.1165 0.2404 −0.0436