Volatility (C1) |
(3.4,4.4,5.4,6.4) |
(M, G) |
Solubility (C2) |
(3.55,4.55,5.55, 6.55) |
(M, G) |
Radioactivity (C3) |
(4.4,5.4,6.4,7.4) |
(M, G) |
Corrosivity (C4) |
(1.75,2.75,3.75,4.75) |
(P, M) |
Acidity and alkaline (C5) |
(1.7,2.7,3.7,4.7) |
(P, M) |
Acute toxicity (C6) |
(3.35,4.35,5.35,6.35) |
(M, G) |
Extraction toxicity (C7) |
(4.2,5.2,6.2,7.2) |
(M, G) |
Air (C8) |
(3.5,4.5,5.5,6.5) |
(M, G) |
Soil (C9) |
(2.15,3.15,4.15,3.95) |
(P, M) |
Geology (C10) |
(1.25,2.25,3.25,4.25) |
(P, M) |
Hydrology (C11) |
(3.15,4.15,5.15,6.15) |
(M, G) |
Ecology (C12) |
(4.05,5.05,6.05,7.05) |
(M, G) |
Population density (C13) |
(3.95,4.95,5.95,6.95) |
(M, G) |
Industry (C14) |
(2.45,3.25,4.05,4.85) |
(P, M) |
Agriculture (C15) |
(4,5, 6,7) |
(M, G) |
Tourism (C16) |
(4.6,5.6,6.6,7.6) |
(M, G) |
Animal husbandry (C17) |
(3.9,4.9,5.9,6.9) |
(M, G) |
Distance of community (C18) |
(4.15,5.15,6.15,7.15) |
(M, G) |
Seepage line and dry beach length (C19) |
(2.75,3.75,4.75,5.75) |
(P, M) |
Height and capacity (C20) |
(2.85,3.85,4.85,5.85) |
(P, M) |
Damming mode (C21) |
(2.05,3.05,4.05,5.05) |
(P, M) |
Type of tailings (C22) |
(3.05,4.05,5.05,6.05) |
(M, G) |
Service period (C23) |
(4.05,5.05,6.05,7.05) |
(M, G) |
Material of dam (C24) |
(2.4,3.4,4.4,5.4) |
(P, M) |
Returning reservoir (C25) |
(4.4,5.4,6.4,7.4) |
(M, G) |
Seepage shaft (C26) |
(4.2,5.2,6.2,7.2) |
(M, G) |
Drainage (C27) |
(3.65,4.65,5.65,6.65) |
(M, G) |
Flood discharge trench (C28) |
(3.45,4.45,5.45,6.45) |
(M, G) |
Flood draining facility (C29) |
(3.3,4.3,5.3,6.3) |
(M, G) |
Revetment construction maintenance (C30) |
(4.15,5.15,6.15,7.15) |
(M, G) |
Dam safety monitoring (C31) |
(4.2,5.2,6.2,7.2) |
(M, G) |
Daily management (C32) |
(4.3, 5.3,6.3,7.3) |
(M, G) |
ISO authentication (C33) |
(4.3,5.3,6.3,7.3) |
(M, G) |
Emergency capacity of rescuing facilities (C34) |
(4.15,5.15,6.15,5.35) |
(M, G) |
Capacity of emergency protection and eliminating leak (C35) |
(3.75,4.75,5.75,6.75) |
(M, G) |
|
Support of government (B10) |
(3.35,4.35,5.35,6.35) |
(M, G) |
Using proportion (B11) |
(2.8,3.8,4.8,5.8) |
(P, M) |
Technology maturity (B12) |
(3.15,4.15,5.15,6.15) |
(M, G) |
Physical characteristic (B1) |
(4.067,5.067,6.067,7.067) |
(M, G) |
Chemical characteristic (B2) |
(3.376,4.376,5.376,6.376) |
(M, G) |
Natural environment (B3) |
(2.248,3.248,4.248,4.972) |
(P, M) |
Social environment (B4) |
(4.023,5.015,6.006,6.997) |
(M, G) |
Characteristics of dam body (B5) |
(2.670,3.670,4.670,5.670) |
(P, M) |
Drainage installation (B6) |
(4.157,5.157,6.157,7.157) |
(M, G) |
Flood drainage facility (B7) |
(3.375,4.375,5.375,6.375) |
(M, G) |
Risk prevention (B8) |
(4.272,5.272,6.272,7.272) |
(M, G) |
Emergency response (B9) |
(3.852,4.852,5.852,6.392) |
(M, G) |
|
Characteristics of solid waste (A1) |
(3.553,4.553,5.553,6.553) |
(M, G) |
Characteristics of environment (A2) |
(3.136,4.131,5.127,5.985) |
(M, G) |
Tailing dam risk (A3) |
(3.111,4.111,5.111,6.111) |
(M, G) |
Risk management (A4) |
(4.125,5.125,6.125,6.964) |
(M, G) |
Utilization prospect (A5) |
(3.100,4.100,5.100,6.100) |
(M, G) |
|
Final objective |
(3.371,4.370,5.370,6.321) |
(M, G) |