Skip to main content
. 2013 Oct 24;13(11):14367–14397. doi: 10.3390/s131114367

Table 13.

Uncertainty budget – Vision System method – d = 0.5 kg/m3.

Uncertainty budget-Vision System

Ci Std. Unc. Contrib. (kg/m3) Variance (kg2/m3) %
δρx/δρL= 1.333976871 1.06E–02 0.0142 2.011E–04 10.38
δρx/δρa1= −0.333978901
δρx/δma= −5525.645555
δρx/δmL= 22043.33278
δρx/δtL= 0.010150884 0.01 0.0001 1.030E–08 0.00
δρx/δta= 2.19739E–05 0.2 0.0000 1.931E–11 0.00
δρx/δγL= −37.17149742 1.05E–03 −0.0390 1.523E–03 78.66
δρx/δd= −1 0.014433757 −0.0144 2.083E–04 10.76
δma/δmp1= 0.99987947 3.35E–08 −0.0002 3.426E–08 0.00
δma/δρa1= −0.000007858 0.00077029 −0.0003 6.618E–08 0.00
δma/δρp1= 9.47E–10 78.90 −0.0004 1.705E–07 0.01
δma/δΔm1= 1 1.47573E–07 −0.0008 6.649E–07 0.03
δma/δd= −1 2.88675E–08 0.0002 2.544E–08 0.00
δmL/δmp2= 0.999880819 4.50E–08 0.0010 9.837E–07 0.05
δmL/δρa2= −0.000001881 0.000769742 0.0000 1.019E–09 0.00
δmL/δρp2= 2.2418E–10 79.74 0.0004 1.553E–07 0.01
δmL/δΔm2= 1 5.47723E–08 0.0012 1.458E–06 0.08
δmL/δd= −1 2.88675E–08 −0.0006 4.049E–07 0.00
δmliq/δCg= 1
δCg/δΔh= −4.73272E–09 0.01 0.0000 1.088E–12 0.00
Unc. (k=2) 0.088 kg/m3