TABLE 1.
Recycling kinetics of ß1-AR and ß2-AR chimera in HEK-293 cells
| Recycling β-AR construct | Additional conditions | t0.5 for recycling | Statistical significance |
|---|---|---|---|
| min | |||
| WT β1-AR | 21 ± 6 | ||
| WT β1-AR | +3 μm H-89/mPKI | No recycling | NDa |
| WT β1-AR | +Scrambled shRNA | 22 ± 8 | p > 0.05b |
| WT β1-AR | +SAP97 shRNA | No recycling | |
| (K476L) β1-AR | 24 ± 7 | p > 0.05b | |
| (E474D) β1-AR | 38 ± 9 | p < 0.01b | |
| (V477I) β1-AR | 19 ± 7 | p > 0.05b | |
| (V477L) β1-AR | 41 ± 10 | p < 0.01b | |
| WT ß2-AR | 25 ± 6 | ||
| WT β2-AR | +Scrambled shRNA | 27 ± 7 | p > 0.05c |
| WT β2-AR | +SAP97 shRNA | 28 ± 8 | p > 0.05c |
| WT β2-AR | +3 μm H-89 | 23 ± 7 | p > 0.05c |
| WT β2-AR | +3 μm mPKI | 25 ± 8 | p > 0.005 |
| (S312D) β1/β2-AR(10) | 20 ± 7 | p > 0.05b | |
| (S312D) β1/β2-AR(10) | +Scrambled shRNA | 21 ± 7 | p > 0.05b |
| (S312D) β1/β2-AR(10) | +SAP97 shRNA | 23 ± 8 | p > 0.05b |
| (S312D) β1/β2-AR(10) | +3 μm H-89 | 25 ± 8 | p > 0.05b |
| (S312D) β1/β2-AR(10) | +3 μm mPKI | 24 ± 7 | p > 0.05b |
| β1-AR aquaporin(10) | 25 ± 8 | p > 0.05b | |
| β1-AR aquaporin(10) | +Scrambled shRNA | 29 ± 9 | p > 0.05b |
| β1-AR aquaporin(10) | +SAP97 shRNA | No recycling | |
| β1-AR GluR1(10) | 22 ± 7 | p > 0.05b | |
| β1-AR GluR1(10) | +Scrambled shRNA | 27 ± 9 | p > 0.05b |
| β1-AR GluR1(10) | +SAP97 shRNA | No recycling | |
| β1-AR μ-opioid(12) | 21 ± 6 | p > 0.05b | |
| β1-AR μ-opioid(12) | +3 μm H-89 | 20 ± 6 | p > 0.05b |
| β1-AR GluR2(10) | 20 ± 6 | p > 0.05b | |
| β1-AR GluR2(10) | +3 μm H-89 | 22 ± 7 | p > 0.05b |
| β1-AR dopamine R1 | 27 ± 8 | p > 0.05b | |
| β1-AR dopamine R1 | +3 μm H-89 | 30 ± 11 | p > 0.05b |
a Not determined.
b Relative to t0.5 of WT β1-AR recycling.
c Relative to t0.5 of WT β2-AR recycling.