Skip to main content
. Author manuscript; available in PMC: 2014 Jan 31.
Published in final edited form as: Serv Sci. 2012 Dec;4(4):382–395. doi: 10.1287/serv.1120.0030

Table 2.

Comparison of the Base Run (Fixed Increments) with the Optimized Increments Run

Activity variable: Annual budget
Outcome variables
B1998 B1999 B2000 B2001 B2002 B2003 y Euphoria (%) Hangover (%)
Base run (linear) 10 12 14 16 18 20 0.55 80 −31
Optimized increments 10 11.03 13.53 16.03 18.54 20 0.21 42 0

Note. The bold values are estimated through optimization.