Changes in the National Staff Survey 2007–2011 (NHS trusts in England)

2007 2009 2011 Change 2007–2009 Change 2009–2011 Standard deviation (2007)
‘I have adequate materials, supplies and equipment to do my work’ 3.22 3.36 3.38 +0.14** +0.02* 0.18
'There are enough staff at this Trust for me to do my job properly’ 2.61 2.78 2.72 +0.17** −0.06** 0.17
‘I do not have time to carry out all my work’ 3.30 3.26 3.25 −0.04** −0.01 0.21

Results are based on the 309 NHS trusts in England with data from all 3 years shown. p values are based on paired sample t tests. Responses were on a 1–5 scale with 5 indicating greater agreement with statements; an increase of 0.10 is equivalent to 10% of respondents moving up one category of response, for example, from ‘neither agree nor disagree’ to ‘agree’.

*p<0.05; **p<0.01.

NHS, National Health Service.