Skip to main content
. 2013 Dec 19;14(1):68–94. doi: 10.3390/s140100068

Table 2.

Telosb operation costs.

a + b ab ab a/b ab
a
ab ab |a|
Fixed point 4 4 15 23 15 250 1 4 4
Floating point 184 187 395 405 395 720 10 37 184