Figure (a) shows the setup for the evaluation of the energy required in the EFT tests, at the beginning (on the left) and at the end (on the right) of a soil penetration trial. In the initial position, the device is positioned in the soil. The growing zone (GZ) is placed at depth h0 (h0 = 100, 150, 200 mm), and the mature zone (MZ) is fixed to a holding structure (HS). The GZ adds new material at the tip, thus increasing the MZ length until it penetrates a total of Δh (30 mm). Figure (b) shows the setup for the evaluation of the energy required in the NoEFT tests, at the beginning (on the left) and at the end (on the right) of a soil penetration trial. In the initial position, a probe (F, light grey) with the same dimensions and geometric properties as the prototype is positioned at depth h0 in the soil (h0 = 100, 150, 200 mm). The prototype is attached to the HS and pushes the probe from the top. The GZ generated the vertical (penetration) force in both the EFT and NoEFT trials in order to have comparable results.