Skip to main content
. 2014 Mar 13;5:205. doi: 10.3389/fpsyg.2014.00205

Table 4.

Performance by task, time of assessment, and group in the SIP.

Time Task Control Intervention
n Mean SE n Mean SE F p
1 (pre-intervention) Tower of London 144 18.59 1.58 141 16.52 1.42 1.09 0.298
Corsi blocks 124 11.56 0.64 113 12.81 0.74 1.51 0.220
FIST* 96 4.66 0.33 73 3.89 0.33 2.02 0.157
Selective attention 119 0.50 0.03 112 0.52 0.03 0.09 0.765
Day/night 148 0.75 0.02 147 0.76 0.02 1.11 0.292
2 (post-intervention) Tower of London 121 26.71 1.71 130 43.17 1.71 56.75 0.000
Corsi blocks 93 15.40 0.92 82 23.20 1.39 27.40 0.000
FIST* 67 5.49 0.31 56 6.50 0.29 6.78 0.010
Selective attention 95 0.63 0.03 83 0.77 0.02 23.45 0.000
Day/night 122 0.83 0.02 121 0.88 0.02 4.73 0.031

Time, moment of cognitive assessment;

*

this task was implemented in the second and third year of the program implementation (2003/2004).