Skip to main content
. Author manuscript; available in PMC: 2014 Apr 4.
Published in final edited form as: Psychol Rev. 2012 Nov 12;120(1):281–292. doi: 10.1037/a0030775

Figure 6.

Figure 6

Plots of recovered drift rates versus values used to generate the predictions for the model with exponentially distributed nondecision time (the values from the bottom part of Figure 5).