Skip to main content
. 2014 Feb 7;118(8):2112–2123. doi: 10.1021/jp4124315

Table 1. Rb and K Values for SDS, CTAB, and ORB.

material line equation R2 Rb ± standard error Dw ± standard error K (average) [lower bound, upper bound]
SDS 2 X + 28.7 0.96 2 ± 0.4 29 ± 10 23000, [16300, 39200]
CTAB 0.3 X + 4.2 0.79 0.3 ± 0.1 4.2 ± 2.8 55000, [29000, 476000]
ORB 0.4 X + 7.3 0.87 0.4 ± 0.1 7.3 ± 3.1 39000, [24000, 99000]