Skip to main content
. 2014 Jan 24;3(1):e119–e122. doi: 10.1016/j.eats.2013.09.001

Table 1.

Summary of Key Points

Pass the sutures and insert the anchors at the 1- and 5-o'clock positions.
Cut only 1 suture limb at each anchor.
Tunnel the suture limbs back under the labrum, adjacent to each anchor, from the glenoid to capsular side.
Shuttle the 2 suture limbs from the capsular to glenoid side at the 3-o'clock position.
Retrieve the sutures, and load and insert the anchor at the 3-o'clock position.
Perform final tensioning of the suture bridge before clamping in the anchor.