Table 1.
Pass the sutures and insert the anchors at the 1- and 5-o'clock positions. |
Cut only 1 suture limb at each anchor. |
Tunnel the suture limbs back under the labrum, adjacent to each anchor, from the glenoid to capsular side. |
Shuttle the 2 suture limbs from the capsular to glenoid side at the 3-o'clock position. |
Retrieve the sutures, and load and insert the anchor at the 3-o'clock position. |
Perform final tensioning of the suture bridge before clamping in the anchor. |