Skip to main content
. Author manuscript; available in PMC: 2015 Jul 1.
Published in final edited form as: Appl Ergon. 2013 Nov 23;45(4):857–864. doi: 10.1016/j.apergo.2013.11.002

Table III. Video time analyzed across material and within job task.

Coded Video Minutes by Job Task

Material # videos Not Coded (minutes) Coded (minutes) Total (minutes) Prep minutes (%) Install minutes (%) Finish minutes (%)
VCT 7 1.5 82.9 84.4 36.2 (43) 21.6 (26) 25.2 (30)
Ceramic 18 14.8 231.1 245.9 28.9 (13) 79.0 (34) 123.3 (53)
Wood 12 10.6 148.3 158.9 11.7 (8) 84.6 (57) 52.1 (35)
Carpet 8 4.7 92.2 96.9 16.3 (18) 52.4 (57) 23.5 (25)
Total 45 31.6 554.5 586.1 93.1 (17) 237.6 (43) 224.1 (40)