Skip to main content
. 2014 Apr 10;15:102. doi: 10.1186/1471-2105-15-102

Figure 5.

Figure 5

Speed-up. Computing nodes are sampled from 1 to 40 with 5 as interval. The red, blue, cyan and grey curve show functions of speed-up of M=10,000, M=50,000 and M=100,000 with sample size fixed to 800.