Skip to main content
. Author manuscript; available in PMC: 2015 Apr 15.
Published in final edited form as: Ann Intern Med. 2014 Apr 15;160(8):526–533. doi: 10.7326/M13-1927

Appendix Figure 7. CAM-S Scores by Costs Per Day (90 Day Follow-Up).

Appendix Figure 7

*Plots of maximal CAM-S scores per patient by costs per day. The green line runs through fitted values derived from log-gamma regression.