Skip to main content
. 2014 Jun;52(6):1812–1817. doi: 10.1128/JCM.00099-14

FIG 2.

FIG 2

Plan-do-check-act cycle of continuous improvement. (Reproduced from reference 10 with permission from the publisher. © 2010–2014 American Society for Clinical Pathology. © 2010–2014 American Journal of Clinical Pathology.)