Figure 1.
Root canal and post space preparation. (a) Radiograph obtained after obturation. (b) The canal was emptied to a depth of 8 mm. (c) The canal was flared till the remaining dentinal wall thickness reached 1.5 mm
Root canal and post space preparation. (a) Radiograph obtained after obturation. (b) The canal was emptied to a depth of 8 mm. (c) The canal was flared till the remaining dentinal wall thickness reached 1.5 mm