Table 2.
Location | Noise reading 1 |
Noise reading 2 |
Noise reading 3 |
Average noise dB(A) |
Mining underground | ||||
725 ramp booster fan | 109.0 | 108.3 | 107.0 | 108.1 |
800x5pump station | 100.0 | 99.0 | 102.0 | 100.3 |
815-580 DD2 Exhaust fan | 104.0 | 102.0 | 108.8 | 104.9 |
815-635 x/c forces fan | 96.0 | 97.0 | 95.6 | 96.2 |
815-670 x/c (Rig 22) | 109 | 105 | 110 | 108 |
LHD 10 @ 800–950 slot | 105 | 109 | 110.2 | 108.1 |
920 diamond drilling machine | 96 | 99 | 99 | 98.0 |
South ramp 900 pump station | 100 | 98 | 100.8 | 99.6 |
860 south ramp pump station | 95.8 | 96 | 97 | 96.3 |
UG workshop | 108.4 | 104.0 | 102 | 104.7 |
UG boiler shop | 102 | 99 | 105 | 102.0 |
Workshop compressor | 103 | 100 | 106 | 103.0 |
Technical services | ||||
Grader | 90 | 94 | 92.4 | 92.1 |
TD 20 | 104 | 102 | 108 | 104.6 |
Electrical workshop | 69 | 75 | 71 | 71.6 |
Underground offices | 69 | 66 | 63 | 66 |
Stores | 74 | 69 | 68 | 70.3 |
Lab sampling preparation room | 109 | 105 | 101 | 105 |
Administration | ||||
Main offices | 56 | 55 | 54 | 55 |
Civils workshop | 100 | 102 | 101 | 101 |
Clinic | 55 | 55 | 56 | 55.3 |
Plant processing | ||||
Plant floor | 106 | 100 | 109 | 105 |
Plant sag mills | 99 | 109 | 105 | 104.3 |
Plant chutes | 89 | 93 | 86 | 89.3 |
CV 3A | 96 | 95 | 93 | 94.6 |
Plant boiler shop | 94 | 96 | 95 | 95 |
Dewatering pumps | 97 | 98 | 99 | 98 |
Plant processing pumps | 95 | 95 | 92 | 94 |
Tank 0 | 91 | 87 | 89 | 89 |
Tank 1 | 90 | 91 | 87 | 89.3 |
Tank 5 | 85 | 86 | 88 | 86.3 |
Tank 6 | 95 | 96 | 94 | 95 |
High security gate | 85 | 83 | 88 | 85.3 |
Carbon screen | 88 | 91 | 87 | 88.6 |
CIL spillage pumps | 95 | 96 | 94 | 95 |
Plant compressor room | 96 | 94 | 95 | 95 |
High security gate | 85 | 83 | 88 | 85.3 |
Plant mechanical, electrical shop | 69 | 73 | 70 | 70.6 |
Crusher pad | 87 | 86 | 85 | 86 |
New tailings budge pumps | 102 | 106 | 105 | 104.3 |
Crusher control room | 87 | 86 | 85 | 86 |