Table 2.

Average noise levels dB(A) Measured Underground and on Surface at the Mine, 2011

Location Noise reading
1
Noise reading
2
Noise reading
3
Average noise
dB(A)
Mining underground
725 ramp booster fan 109.0 108.3 107.0 108.1
800x5pump station 100.0 99.0 102.0 100.3
815-580 DD2 Exhaust fan 104.0 102.0 108.8 104.9
815-635 x/c forces fan 96.0 97.0 95.6 96.2
815-670 x/c (Rig 22) 109 105 110 108
LHD 10 @ 800–950 slot 105 109 110.2 108.1
920 diamond drilling machine 96 99 99 98.0
South ramp 900 pump station 100 98 100.8 99.6
860 south ramp pump station 95.8 96 97 96.3
UG workshop 108.4 104.0 102 104.7
UG boiler shop 102 99 105 102.0
Workshop compressor 103 100 106 103.0
Technical services
Grader 90 94 92.4 92.1
TD 20 104 102 108 104.6
Electrical workshop 69 75 71 71.6
Underground offices 69 66 63 66
Stores 74 69 68 70.3
Lab sampling preparation room 109 105 101 105
Administration
Main offices 56 55 54 55
Civils workshop 100 102 101 101
Clinic 55 55 56 55.3
Plant processing
Plant floor 106 100 109 105
Plant sag mills 99 109 105 104.3
Plant chutes 89 93 86 89.3
CV 3A 96 95 93 94.6
Plant boiler shop 94 96 95 95
Dewatering pumps 97 98 99 98
Plant processing pumps 95 95 92 94
Tank 0 91 87 89 89
Tank 1 90 91 87 89.3
Tank 5 85 86 88 86.3
Tank 6 95 96 94 95
High security gate 85 83 88 85.3
Carbon screen 88 91 87 88.6
CIL spillage pumps 95 96 94 95
Plant compressor room 96 94 95 95
High security gate 85 83 88 85.3
Plant mechanical, electrical shop 69 73 70 70.6
Crusher pad 87 86 85 86
New tailings budge pumps 102 106 105 104.3
Crusher control room 87 86 85 86