Skip to main content
. 2014 Jun 13;9(6):e100208. doi: 10.1371/journal.pone.0100208

Figure 4. Two representative examples of patient journeys before and after implementation of Lean Six Sigma derived syncope pathways at Victoria Hospital Blackpool.

Figure 4

Red diamonds indicate points on the patient journey before the implementation of new pathways; green triangles show points on the journey with the new pathways structured after the Lean SIx Sigma project. Events in the patient journey and performed tests are noted in the boxes.