Skip to main content
. 2013 Jul 1;40(4):835–844. doi: 10.1093/schbul/sbt089

Table 3.

Means and SDs of Performance Measures for Patients With Schizophrenia and Healthy Controls

Time 1a Time 2 Time 3
Patient Control Patient Control Patient Control
Task n M (SD) n M (SD) n M (SD) n M (SD) n M (SD) n M (SD)
DPX 92 2.30 (1.25) 127 3.21 (0.88) 90 2.58 (1.10) 122 3.30 (0.83) 86 2.73 (1.15) 119 3.35 (0.80)
AX-CPT 95 2.58 (1.02) 128 3.34 (0.87) 93 2.90 (1.07) 123 3.48 (0.73) 88 2.96 (1.07) 122 3.50 (0.78)
CCE 98 128 95 123 94 123
 Difference 6.63 (11.43) 8.10 (10.64) 6.63 (12.55) 8.33 (8.85) 8.13 (9.09) 8.65 (9.15)
JOVI 92 130 92 128 94 122
 Thresholdb 1.12 (0.10) 1.09 (0.07) 1.10 (0.10) 1.07 (0.08) 1.10 (0.10) 1.06 (0.09)
 Proportion correct 0.69 (0.08) 0.72 (0.08) 0.72 (0.09) 0.76 (0.07) 0.73 (0.09) 0.77 (0.09)
RiSE 96 127 95 123 92 123
 AR 0.33 (0.24) 0.56 (0.20) 0.32 (0.27) 0.55 (0.25) 0.26 (0.28) 0.52 (0.23)
 IRIE 0.65 (0.26) 0.84 (0.11) 0.66 (0.23) 0.85 (0.11) 0.70 (0.19) 0.84 (0.11)
 IRAE 0.61 (0.27) 0.83 (0.11) 0.62 (0.22) 0.82 (0.14) 0.65 (0.21) 0.82 (0.13)

Note: DPX, Dot Probe Expectancy; AX-CPT, AX continuous performance test; RiSE, Relational and Item-Specific Encoding Task; AR, Associative Recognition; IRIE, Item Recognition, Item Encoding; IRAE, Item Recognition, Relational Encoding; CCE, Contrast-Contrast Effect; JOVI, Jittered Orientation Visual Integration.

aThe time between first and second testing averaged 7.2 days (range 4–14) and between second and third testing averaged 14.4 days (range 10–29).

bThreshold values were transformed to conform to normality (see text). Larger values correspond to worse performance.