Skip to main content
. 2006 Feb 21;12(7):1133–1135. doi: 10.3748/wjg.v12.i7.1133

Figure 1.

Figure 1

Scheme of in vitro tubulin assay. The tubulin assembly was achieved at the end of the absorption after 20 min incubation and kept a steady state level at 37 °C. The disassembly was carried out at 4 °C and after the assembly (40-min incubation).