Skip to main content
. 2014 Feb 23;55(4):780–787. doi: 10.1093/jrr/rru001

Fig. 6.

Fig. 6.

Distribution of dwell times for the multiple interstitial needle applicators (n = 8 treatment plans). Inverse planning and graphical optimization are used to optimize dwell time in the Treatment Planning System.