Skip to main content
. Author manuscript; available in PMC: 2014 Jul 22.
Published in final edited form as: Conf Proc IEEE Eng Med Biol Soc. 2012;2012:5730–5733. doi: 10.1109/EMBC.2012.6347296

TABLE I.

POWER BUDGET OVER DIFFERENT CONDITIONS

Charge delivered over time (C/s = A)

Trial 1:
Benchtop test
configuration
Trial 2: Higher
resistance
through passive
element
Trial 3:
Variability
among PUTs
R1 and R2 2.81μA 0.9μA 5.19μA
Exponential
decay pulse
10.1μA 1.58μA 2.22μA
Rc 0.026μA 0.002μA 0.003μA
Total
Discharge
Current
12.9μA 2.48μA 7.41μA
Days 9.66 days 50.4 days 16.9 days