Skip to main content
. 2014 Jul 22;8:251. doi: 10.3389/fnbeh.2014.00251

Table 2.

Correlations (r-values) between ERP components in the Speed- and Accuracy-groups.

Speed-groups Accuracy-groups
pN N1 dpP latency P3 BP P1 N2
BP 0.61*** 0.43** 0.33* −0.57*** pN 0.4** 0.35* 0.43**

When not specified, the amplitude values are considered. *p < 0.05; **p < 0.01; ***p < 0.001.