Skip to main content
. Author manuscript; available in PMC: 2014 Aug 12.
Published in final edited form as: Rep U S. 2013;2013:4092–4098. doi: 10.1109/IROS.2013.6696942

Fig. 8.

Fig. 8

Master-slave position tracking results and its error. The master robot is manually moved and the insertion axis of slave robot tracks this motion in 27.6 seconds with 0.318 mm RMS error.