Skip to main content
. 2014 Aug 4;2014:986714. doi: 10.1155/2014/986714

Figure 2.

Figure 2

Testbed adopted in the simulations; in the figure L x = 40 m and L y = 20 m and the APs are in the positions denoted by red circles.