Skip to main content
. 2014 Aug 29;4:5860. doi: 10.1038/srep05860

Figure 4. Amount of Cr(VI) in the leakage for different slag samples in the leaching procedure.

Figure 4

(5 g samples, flow rate of 9.5 mL/h, equal to the level of storm rain, H2SO4 with a pH value of 4.5.).