Skip to main content
. 2014 Aug 13;67(1):45–51. doi: 10.1097/QAI.0000000000000224

FIGURE 1.

FIGURE 1

Routine VL monitoring cascade, showing “leaks” at each step, Shiselweni, Swaziland, October 1, 2012 to March 31, 2013.