Skip to main content
. 2014 Aug 4;14(8):14106–14130. doi: 10.3390/s140814106

Table 3.

A comparison of the number of estimated operations (Θ and Ω) and the real average time per frame TA among the proposed algorithm and the reference ones ATT [17] and PATT [18]. O, OTCBVS dataset; A, AMCOM dataset; AI, AIC dataset.

Dataset Seq. ATT [17] PATT [18] RATT



Θ TA (ms) Θ TA (ms) Ω TA (ms)
O 03-l1s1ir-1 44,327,745 1.38 25,529,427 0.6 1,566,894 0.195
O 03-l1s1ir-2 7,153,641 0.105 7,153,641 0.075 F F
O 03-l1s2ir-1 18,367,074 0.705 13,108,293 0.615 5,489,448 0.33
O 03-l1s2ir-2 51,987,771 1.515 43,297,551 1.41 3,364,434 0.135
O 03-l1s2ir-3 4,810,113 0.195 2,347,884 0.165 955,431 0.06
O 03-l1s2ir-4 235,224 0.015 235,224 0.09 240,976 0.015
O 03-l1s3ir-1 18,614,277 0.69 17,466,471 0.975 842,783 0.225
O 03-l1s3ir-2 16,302,330 0.525 7,713,387 0.375 7,733,224 0.42
O 03-l1s3ir-3 6,477,372 0.15 25,256,088 0.87 4,393,722 0.135
O 03-l2s4ir-1 34,940,565 1.065 46,422,981 1.365 2,690,423 0.3
O 03-l2s6ir-1 10,475,091 0.3 116,460,927 4.11 3,333,523 0.24

A 14-15-mantruck 4,054,347 0.21 3,404,214 0.165 2,757,862 0.17
A 16-08-m60 14,668,830 0.42 6,390,252 0.24 2,848,082 0.20
A 16-08-apc 1,512,621 0.18 1,512,621 0.09 785,195 0.09
A 16-18-apc 5,798,925 0.255 3,130,875 0.21 2,945,375 0.16
A 16-18-m60 1,495,197 0.075 1,009,503 0.075 1,009,726 0.06
A 17-02-mantruck 2,516,679 0.15 4,971,285 0.225 2,172,300 0.14
A 17-02-bradley 2,689,830 0.21 3,391,146 0.18 1,814,151 0.17
A 18-13-m60 6,608,052 0.63 3,627,459 0.15 2,230,301 0.19
A 18-16-m60 26,278,659 1.23 3,150,477 0.15 1,592,641 0.14
A 19-06-apc 3,338,874 0.165 3,555,585 0.165 2,046,767 0.17
A 21-17-apc 3,528,360 0.225 3,840,903 0.165 3,542,997 0.24

AI ir11-1 306,883,104 4.88 362,142,352 5.18 4,829,325 0.39
AI ir11-2 364,246,784 6.99 392,884,096 5.5 2,891,167 0.24