Skip to main content
. 2014 Oct 16;9(10):e108153. doi: 10.1371/journal.pone.0108153

Table 2. Average ± sd of sediment chlorophyll-a, measured and estimated sediment processes and macrobenthic parameters for each of the factors (pH treatment, Month, Sediment or their interactions) with a significant effect.

pH Month Month×pH Sediment Sediment×Month Sediment×Month×pH
Chlorophyll- a - - - Permeable February Control 0.05±0.07
Acidified 0.02±0.03
April Control 0.13±0.07
Acidified 0.13±0.04
Fine sandy February Control 0.29±0.04
Acidified 0.68±0.33
April Control 0.81±0.47
Acidified 11.03±4.48
SCOC (mmol O2 m−2 d−1) Control 11.73±8.09 - Permeable February 5.87±4.98 -
Acidified 6.63±7.45 April 1.25±2.36
Fine sandy February 10.33±3.57
April 19.26±3.21
NHx efflux (mmol N m−2 d−1) - February 1.09±1.55 Permeable 0.31±0.39 -
April 1.00±1.00 Fine sandy 1.79±1.41
NOx efflux (mmol N m−2 d−1) - - Permeable February 8.66±1.22 -
April 0.25±0.47
Fine sandy 3.04±2.53
Nitrification (mmol N m−2 d−1) - February Control 3.74±2.21 Permeable February 3.15±2.36 -
Acidified 0.22±1.14 April 0.02±0.87
April 0.87±1.24 Fine sandy 1.17±1.72
N mineralization (mmol N m−2 d−1) - - Permeable February 4.88±1.23 -
April 0.42±0.64
Fine sandy 2.97±0.84
Density (ind. m−2) - February 725±879 Permeable 44±41 -
April 370±412 Fine sandy 1050±659
Biomass (g m−2) - - Permeable 3±5 -
Fine sandy 189±137
Species richness (core−1)* - - Permeable *per 283.53 cm2 1.13±0.99 -
Fine sandy *per 78.54 cm2 3.13±1.25
BPc (m−2) - February 898±1102 Permeable 57±51 -
April 601±671 Fine sandy 1442±785