Skip to main content
. 2014 Nov 11;9(11):e112195. doi: 10.1371/journal.pone.0112195

Figure 1. Traffic volume from 13:00 on April 24th to 13:00 on April 25th in the Xiangyin tunnel (south bore).

Figure 1