Skip to main content
. 2013 Oct 31;12:100. doi: 10.1186/1475-2859-12-100

Figure 8.

Figure 8

Automated FC set-up. A: Scheme of the interfacing system between the bioreactor and the FC; B: Sequence of activation of the dilution and sampling pump. First, activation of the sampling pump to fill the line and, second, activation simultaneously with the dilution pump to reach an appropriate dilution of the sample before FC analysis.