Skip to main content
. 2004 Jun 1;101(23):8537–8541. doi: 10.1073/pnas.0402744101

Fig. 1.

Fig. 1.

Concentration of dissolved gases measured in and around the fertilized patch. Surface-water measurements made 4 weeks after the initial iron fertilization. Note that the samples were taken over a period of 50 h.