Skip to main content
. 2014 Oct 20;14(10):19622–19638. doi: 10.3390/s141019622

Table 4.

Number of beam switches required for beam-tracking in three different scenarios.

Scenario 1 Scenario 2 Scenario 3 Total
Conventional technique Tx 0 192 1,640 1,832
Rx 2,240 960 65,600 68,800

Proposed technique Tx 0 192 0 192
Rx 0 960 0 960