Table 2.
Phyllochron (°C days) | |||||
Planting | Soil temperature | Air | Soil | ||
date | treatment | 1998 | 1999 | 1998 | 1999 |
PD1 | +0C | 69·6 (2·2) | 79·8 (1·5) | 88·4 (2·9) | 111·3 (2·8) |
+3C | 67·1 (2·3) | 75·0 (3·3) | 106·4 (3·7) | 128·9 (6·8) | |
Mean | 68·4 (1·5) | 77·4 (1·9) | 97·4 (4·0) | 120·1 (4·7) | |
PD2 | +0C | 76·4 (3·0) | 73·0 (0·7) | 94·2 (4·0) | 93·3 (1·5) |
+3C | 73·8 (4·9) | 72·4 (1·3) | 109·9 (7·5) | 111·9 (2·0) | |
Mean | 75·1 (2·7) | 72·7 (0·7) | 102·1 (4·9) | 102·6 (3·7) | |
PD3 | +0C | 78·6 (2·8) | 74·6 (1·0) | 99·9 (3·4) | 93·8 (1·3) |
+3C | 72·4 (2·2) | 73·9 (1·0) | 108·1 (3·1) | 108·0 (1·9) | |
Mean | 75·5 (2·0) | 74·3 (0·7) | 104·0 (2·6) | 100·9 (2·9) | |
All | +0C | 74·8 (1·8) | 75·8 (1·0) | 94·2 (2·3) | 99·5 (2·7) |
All | +3C | 71·1 (2·0) | 73·8 (1·2) | 108·1 (2·7) | 116·3 (3·5) |
All | Both | 73·0 (1·4) | 74·8 (0·8) | 101·2 (2·3) | 107·9 (2·8) |
Data are means (s.e.).