Table 2.
CTV2 to PTV2 margin (mm) | TCP (planning CTV2 DVH) | TCP (mean CBCT CTV2 DVH) | p-value (two-tailed)a | Mean CBCT TCP relative to original plan TCP (%) |
---|---|---|---|---|
5 | 81.8% (78.9–83.8) | 82.0% (79.5–84.0) | 0.009 | 0.3 (−1.1 to 1.0) |
4 | 81.7% (78.7–83.8) | 81.8% (79.2–83.9) | 0.034 | 0.1 (−1.5 to 0.7) |
3 | 81.9% (78.8–83.8) | 81.9% (79.2–83.6) | 0.272 | 0.2 (−2.0 to 0.7) |
Data are represented as mean (range).
Wilcoxon signed rank test.