Table B3.
Details of the Hanford 300 Area IFRC Scenario
Scenario | IFRC |
---|---|
Domain | 120 m × 120 m × 15 m |
Grid size | 120 × 120 × 30 |
Number of primary species | 10 |
Number of secondary species | 43 |
Number of minerals | 1 (Calcite) |
Number of site fractions | 50 |
Total flow dofs | 432,000 |
Total transport dofs | 4,320,000 |
Initial time step size | 1 h (at restart) |
Max. time step size | 1 h |
Simulation duration | 509 h |
Number of flow time steps | 701 |
Number of transport time steps | 809 |