Skip to main content
. 2014 Dec 1;16(12):e269. doi: 10.2196/jmir.3626

Figure 3.

Figure 3

Gant chart illustrating the timeline and design for data collection of the preliminary work. Each rectangle represents a classroom grade full protocol timeline. Thick bars on the horizontal axis represent 1 calendar week. Each collection took approximately 3 weeks.