Skip to main content
. 2014 Nov 4;14(11):20800–20824. doi: 10.3390/s141120800

Table 2.

Percentage of frames with TE larger than different threshold values for RML and POM-KSP.

Sequence 1 Sequence 2


TE > 100 cm TE > 150 cm TE > 100 cm TE > 150 cm
RML 1.2% 0.2% 6.5% 0.4%
POM-KSP 15.3% 7.5% 23.1% 13.9%