Table 1.
Time | Task (derived from the diary) | Measurement | Kneeling/squatting | Reconstruction |
---|---|---|---|---|
07.00–07.30 | Approach (driving) | – | Non relevant | |
07.30–08.00 | Preparation of worksite | – | Non relevant | |
08.00–08.30 | Application of glue | M1 | × | M1 |
08.30–10.30 | Laying carpet | M2 | × | M2 |
10.30–11.00 | Application of glue | × | M1 copy | |
11.00–12.30 | Laying carpet | × | M2 copy | |
12.30–13.00 | Break | – | Break | |
13.00–13.30 | Preparation work | – | Non relevant | |
13.30–14.00 | Application of glue | × | M1 copy | |
14.00–15.30 | Laying carpet | × | M2 copy | |
15.30–16.00 | Clearing of worksite | – | Non relevant |
Non relevant = none of the defined knee-straining postures occurred