Skip to main content
. 2015 Feb 4;10(2):e0116846. doi: 10.1371/journal.pone.0116846

Fig 5. Implementation costs [BRL] per 20×20 km grid cell with (left panels) and without (right panels) fine revenues for policy mix without (upper panels) and with PES (lower panels).

Fig 5

Parameter values: B = BRL 50 million, F = BRL/ha 5000, PES = BRL/ha 0 or 500.